Primary Use Cases
Renewable Connections
Future Energy Markets
Whole System
FACILITATING WHOLE SYSTEM APPROACH
Transmission ANM
Balancing Services
Virtual Power Plant
N-3 Intertripping
System Protection
SUPPORTING ENERGY MARKETS
Demand Prediction
Generation Prediction
Network Congestion Forecasting
Aggregation Interface/Control
IMPROVING GRID RESILLIENCE
Microgrid Control / Islanding
Blackstart Function
Realtime Fault Level Management
Rating Management

Incremental Deployment
The system’s modularity allows it to easily scale from a single substation network to a large regional or national system supporting dual and triple location redundancy for increased resilience. The system can be deployed incrementally in the knowledge that it can meet larger, future requirements.
​
Flexible Deployment Options
Decentralised
​
System Deployed at Level 2 with a datalink to the DMS/SCADA system. The Level 1 DER Interface is managed directly by the Level 2 Controller.
Centralised (Direct)
​
System Deployed at Level 3 with a datalink directly from the DMS/SCADA system. The Level 3 System interfaces with the DMS / SCADA System. Automation is deployed centrally.
Centralised (Dual)
​
System Deployed at Level 3 with DER datalinks directly from the DMS/. SCADA system and from the L3 System itself . The Level 3 System also interfaces with the DMS / SCADA System. Automation is deployed centrally.
Centralised (Hybrid)
​
System Deployed at Level 3 with both a datalink directly from the DMS/SCADA system and the system itself. The Level 3 System interfaces with the DMS / SCADA System. Automation is deployed centrally and optionally deployed at Level 2.