CONTROL

DER Integration, Communication, Visualisation and Control

Project 1

Integrating DERs into the Energy System

shutterstock_710229949_edited_edited.jpg

Level 1 DER Integration - Field Deployment

DER Integration

Telecontrol / Local Automation

Full P / Q / V Dispatch

All Technology Types

L1 Controller

DER Site

DER Substation

Project 2
Anchor 1
shutterstock_710229949_edited_edited.jpg

Level 1 DER Integration with SCADA/DMS

DER Interface

L1 - DER Integration

DER Communications Interface

Serial / Protocol Interface

​

Modbus

DNP3

IEC101/104

IEC 61850

DER Substation

DER Control Interface

4-20mA / +/-10Vdc  Actual Values

4-20mA / +/-10Vdc  Actual Values

Volt Free Digital Output Signals

Volt Free Digital Input Signals

Serial / Protocol Interface

​

Level_1_Link.png
DER Interface
Anchor 2

Flexible Deployment Options

Level 3 - Control Centre

ZOOM_Main_Model_Level_3A_edited.jpg

Core

Core

Core

Primary_Substation_GSP_External_v100.jpg
BESS_Control_v102.jpg

Level 2 - Substation

Level 1 - Field

Core

DER Controller

DMS / SCADA

Decentralised

​

The Level 1 DER Interface is managed directly by the Level 2 Controller.

Centralised (Direct)

​

The Level 1 DER Interface is managed directly by the Level 3 Controller.

Centralised (Indirect) 

​

The Level 1 DER Interface is managed directly by the Level 3 Controller but via the SCADA/DMS Control channels.

Centralised (Hybrid) 

​

The Level 1 DER Interfaces are managed directly by the Level 3 Controller and also the SCADA/DMS System.

Anchor 3

DER Visualisation - Mode Control , Setpoint 

DER_Ops_Dash_LOcalMOde.png
Local Mode
Local Setpoint
Realtime Active Power Flow
Anchor 4

DER Visualisation - Control Path Selection 

DER_Ops_Dash_LOcalMOde.png
Local Mode
Local Setpoint
Realtime Active Power Flow